Skip to content

DL-175

The real-Postgres pgtest suites run INLINE as a step in the one existing CI job — no separate CI job, lane, or moon task; one required check, hermetic moon test stays dependency-free via the build tag (D-A1, overruling the ancestor record’s separate test-pg lane; Matt: “trimmed but no extra CI job, it goes in the same existing job”)

Status: Active (Matt, 2026-08-07)

Record: ../../meta/compass-test-strategy/design.md#a1–one-ci-job-pgtest-inline-no-separate-lane-amends-the-ancestor-records-d2dl-049